Decide Then Build
Name the decision → Name the constraint → Build the smallest loop.
- When to use
- When building is cheap and the failure mode is shipping the wrong thing, faster.
- Example
- The sequence used on HealthTech and EdTech work. Three moves, in order, before a line of product code. Not a pitch. A working loop.
01 · Name the decision
AI made execution cheap without making deciding easy. The failure mode moved upstream: shipping the wrong thing, faster.
02 · Name the constraint
Clinical, regulatory, ethical, or a hiring manager’s bar. The constraint is the brief — not a backlog of features.
03 · Build the smallest loop
One artefact that would change that decision. Specs without a prototype are theatre; prototypes without a decision are toys. Humans stay on the hook.
Coming soon as a SKU. No Gumroad, no PDF, until a URL exists.